Will the project be constructed with cast iron risers, encased in concrete, with seats bolted to the infrastructure? This design concept would be similar to the seating behind the baskets but with chair backs? Or will it be a 2024 version of what exists on the lower tiers, retractable chair back seats on a wood base with a bit more space?
Reading between the lines of the Tribune/Vindy articles suggests it may be the latter.